GM
Gus Melonas
8quotes
Quotes by Gus Melonas
"
The occupant of the vehicle was able to escape. There was minimal damage to the train and no injuries to the crew.
"
Projected business volumes (on the line) do not support operating costs. This was a business decision.
"
This week the BNSF will be meeting with representatives to further discuss the Port of Quincy issue.
"
The crew was whistling before impact and put the train into an emergency brake application. Unfortunately the train was unable to stop (in time).
"
With the heavy saturation, we have erosion and sloughing of the cliffs. The debris has no place to go but down.
"
It has been determined that it was not speed-related. (The train) was traveling 46 mph in a 60 mph zone.
"
We are adjusting our operations to minimize the blockage at Birch Point. We'll try to minimize it to no more than 10 to 15 minutes.